The numbers, up front
Typical figures per model, so you can plan before you ask. Your quote confirms them for your designs.
| Material | Minimum per model | Sampling | Bulk production |
|---|---|---|---|
| Cellulose acetate | 300 pcs per model | 3–4 weeks | 45–60 days |
| Bio-acetate | 300 pcs per model | 4 weeks | 50–60 days |
| Titanium and β-titanium | 300 pcs per model | 4–5 weeks | 60 days |
| Stainless steel | 500 pcs per model | 3–4 weeks | 45 days |
| TR90 and Ultem | 1,000 pcs per model | 5–6 weeks incl. mould | 45 days |
| Wood, bamboo and buffalo horn | 200 pcs per model | 4–5 weeks | 60 days |
| 3D-printed nylon | 50 pcs per model | 2 weeks | 30 days |
| Combination frames | 300 pcs per model | 4–5 weeks | 60 days |
Bulk production starts after you approve the final sample. Shipping time is extra and depends on the route.
What decides the price
- Material and construction. Titanium and hand-finished acetate cost more than stainless steel or injection-moulded frames.
- Colourways. Each extra colour of a model adds set-up work; custom acetate colours have their own minimums.
- Logo and details. Laser engraving is the simplest; metal inlays and custom hinges need tooling.
- Packaging. Branded cases, cloths and boxes are quoted separately and have their own minimums.
- Quantity per model. Your quote shows unit prices at several quantities so you can see where the price drops.
Questions brands ask first
- Will anyone else be able to buy my design?
- No. A custom design is made for one brand only, and we put that in writing. We never show client designs on this site without written permission.
- Can we sign an NDA before I share sketches?
- Yes. Ask in your brief and we will send ours, or sign yours.
- I only have an idea, not drawings. Can you help?
- Yes. Most brands start with a mood board and a few reference photos. Our designers turn that into proposals for you to refine.
- What decides the price?
- Material, finish, how many colourways, logo method, packaging and quantity per model. Your quote shows unit prices at several quantities so you can plan.
- How do payments work?
- Payment terms are written into your quote. Typically a deposit after you approve the quote and the balance after you approve the inspection report.
Your quantities are smaller, or your timing is tight?
Tell us anyway. There is often a way, for example stock colours or a 3D-printed test run.